Sepp Leaf Water-Based Gilding Size 4-Ounce

Related posts

Feature

Specially designed for gilding with real and imitation gold leaf, silver and aluminum leaf and copper leaf.
Clean brushes with mild soap and warm water
Ready to be gilded 15-30 minutes after application, depending on conditions.
Water-based size will remain open for gilding for 24-36 hours.
Covers approximately 5 square feet

Description

The surface should be smooth and primed to produce a non-absorbent surface. Mix well before using. Apply at package consistency with a soft, natural hair brush. The layer of size needs to be smooth, even and as thin as possible. Avoid puddling in crevices. It is ready for gilding in 15-30 minutes, when the surface is dry but tacky, and remains open for gilding for 24 to 36 hours, depending on temperature and humidity.